Turnkey chemical cleaning and steam blowing

Together with Proses Su Teknolojileri A.Ş. and Germany’s GCE Service GmbH, we have delivered joint projects since 2019 with domestic and international boiler manufacturers and operating thermal plants. Chemical cleaning and steam blowing projects are executed turnkey in accordance with the German VGB S-513 standard.

Chemical cleaning

Together with GCE Service, we have directly commissioned chemical cleaning and steam blowing for boilers totaling over 55,000 MW worldwide.

Steam blowing

We have strong field experience in quiet steam blowing with lower fuel consumption and refinery decontamination.

Boiler water phase

We perform chemical cleaning of economizers, water walls, drums, steam separators, and storage tanks.

Boiler steam phase

We apply chemical cleaning and steam blowing on superheater and reheater lines.

Process

How chemical cleaning projects progress

01

Project preparation

  • Deposit analysis with pipe samples
  • Acid, inhibitor, and concentration determination
  • Procedure preparation per VGB S-513
  • System volume, demin water, and waste calculation
  • Flow and velocity distribution engineering
02

Project execution

  • Chemical cleaning program and P&ID
  • Risk assessment and MSDS documents
  • Process monitoring via field laboratory
  • High-flow pump and steam systems
  • Final report based on VGB S-513

Field equipment and laboratory

We monitor processes with a 2×600 m³/h – 15 bar inverter-driven pump station, mixing tank, acid dosing pumps, a 3.4 MW steam generator, steam injection system, cross-flow valve station, and a field laboratory equipped with spectrometer, pH meter, conductivity, ORP, and ultrasonic flow meter. Wastewater management design, membrane coating, and disposal consulting are available as optional services.

Projects

Completed and ongoing work

  • 2026 (Ongoing)Kırıkkale / TurkeyTüpraş & Tekfen İnşaatSulphur Recovery Unit — SR condensers alkaline boil-out; oxygen enrichment unit degreasing.
  • 2025Pljevlja / MontenegroPOWERCHINA & EPCGChemical cleaning of 225 MW coal-fired thermal power plant.
  • 2025Kırıkkale / TurkeyTüpraş & Aalborg CSPConventional boiler steam blow.
  • 2025Balıkesir / TurkeyEti Maden & EKONBoron production plant — steam blow of turbine steam lines.
  • 2025Kahramanmaraş / TurkeyKipaş Holding & ValmetBatı Kipaş Paper Mill Power Station 55 MW — pre-operational chemical cleaning under Valmet (Finland) supervision.
  • 2024–2025Zonguldak / TurkeyTP OTCSakarya Gas Field Development Project Filyos — operational chemical cleaning of 6 spiral heat exchangers (MEG regeneration process).
  • 2024Kütahya / TurkeyEti Maden & EKONSulfuric acid production plant — steam lines chemical cleaning and steam blow.
  • 2024Adana / TurkeySASA Polyester & Técnicas ReunidasNew PTA refinery complex — main steam lines chemical cleaning (1,270 m³); boiler A&B chemical cleaning and steam blow; hydrogen and instrument system cleaning; waste heat boiler cleaning; stainless steel lines passivation.
  • 2024Komotini / GreeceTERNA S.A. (GEK Terna Group)660 MW HRSG pre-operational chemical cleaning and steam blow into condenser.
  • 2024Tashkent / UzbekistanÇalık EnerjiTashkent THPE Power Plant 2 × 32 MW — pre-operational chemical cleaning and steam blow.
  • 2024Yalova / TurkeyAKSA125 t/h Sulzer boiler — pre-operational chemical cleaning.
  • 2023Hong Kong / ChinaSiemens EnergyBlack Point Power Station Unit D2 — pre-operational chemical cleaning as a subcontractor of Siemens Energy GmbH (Germany).
  • 2023Kostolac / SerbiaChina Machinery Engineering CorporationKostolac TPP Unit 3 350 MW — pre-operational chemical cleaning and steam blowing as a subcontractor of CMEC and Inter-Kontakt Energo d.o.o. (Serbia).
  • 2022–2023Hatay / TurkeyİSDEMİRİskenderun Steel Mill Power Station Units 3/4/5 — chemical cleaning of seawater-cooled condensers.
  • 2023Konya & Tokat / TurkeyTeta5ER Enerji biomass boiler (47,000 kg/h) pre-operational chemical cleaning; CEMAK Enerji biomass boiler (30,000 kg/h) alkaline boil-out.
  • 2021–2022Kütahya / TurkeyÇelikler HoldingTunçbilek Thermal Power Plant Units 4 & 5 (150 MW) and Unit 3 (65 MW) — boiler waterside post chemical cleaning.
  • 2021Bolu / TurkeyAET (Aalborg Energie Technik)MAV Energy biomass plant 35 MW — turnkey pre-operational chemical cleaning as a subcontractor of Aalborg Energie Technik (Denmark).
  • 2021Aydın / TurkeyKipaş Holding & ValmetBatı Kipaş Paper Mill Power Station 55 MW — pre-operational chemical cleaning under Valmet (Finland) supervision.
  • 2020Çanakkale / TurkeyODAŞODAŞ Çan 2 Thermal Power Plant 350 MW — RH tubes post chemical cleaning.